The Crossfit Haymaker locker rooms renovation consisted of taking existing offices, restrooms, and a mechanical room with a mezzanine above and renovating the space for new locker rooms with a larger mezzanine. Timber Rock Construction removed the existing space down to the studs, installed drains in the concrete floor, re-framed for new walls for the locker rooms and larger mezzanine, completed all finishes, and installed toilet accessories. Renovation was completed in June of 2014.
Share